Thursday, January 22, 2015

The handrails Puukeskus was applied, according to which I grabbed the last of more than 4m 45mm rou

Week 43/13: Piiiiitkäää to-do list full of keys and mysteries (Updated 25/10/2013) | The front man of the house new inmates
Raisin is a veteran house Turku Hammer WWTP. Raisin has already been reached, perhaps a little kuivahtamaan and needs renovation here and there, both indoors and outdoors. The work began in the basement and from there they then expand "priority" thick foam to the rest of raisin cavities.
2013 (2) 2014 (1) fence (1) Initial state (1) Asbestos (4) Reception (12) Solar Heater (2) garage (13) Avokomposti (1) BEAM (2) Concrete (28) DIY (2) Before ( 1) Ensto (2) eOhjain (3) Insulation (28) front yard (20) Finfoam (19) The fan (1) Benefit Garden (2) Window (8) Ventilation (18) Celebrations (1) cabinets (8) handrail (2) whitewash (6) kalkkitahna (4) lime water (4) roof (15) Kitchen (20) Cellar (64) Kellarinraput (5) Central Vacuum Cleaning thick foam (3) Stone Wall (19) kiviraput (9) Laundry Room (37) Bathroom (17) Tiles ( 13) Laitilan Special furniture (7) Laitilan Construction Sheet (3) Flooring (40) Underfloor heating (18) Benches (1) Lists (1) Snow barriers (1) Geothermal (10) Painting (10) Masonry (14) Migration thick foam (2) Nereus ( 10) Oil boiler (4) Oil (7) Living Room (2) Doors (5) Door Factory Vihanto (8) Pandion MDE (1) Patio (1) Embankment (14) petroliöljymaali (3) PEX (18) Patio (45) Garden furniture ( 2) Outdoor Lighting (3) Pipe (2) Firewood (3) The Dressing Room (2) Wood burning stove (11) Reciprocating Saw (6) Logging (3) Garden (24) Radiator thick foam (3) Dust hood (5) Dining Room (3) Raisin thick foam (139) Electricity (24) Salomaa radiator factory (3) Sauna (18) Scheppach (3) Schneider Exxact (1) Wall (4) Gravel (2) cleaning (5) SLO (1) SPU Insulation (2) Fireplace (1) Wallpaper ( 3) The technical area (9) Temrex (1) Termex (1), Danfoss (10) Uula (3) Lighting (11) READY (5) Casting (14) Waterproofing (2) Sewer (21) Vilpe (1) Greyhounds (4 ) WC (16) Roof (3) Categories
1st floor (middle layer) (28) Lounge thick foam (14) Lounge area (3) Garage (18) eOhjain (7) Ventilation (23) Facade (21) Roofing (6) Kitchen (26) Basement (91) Basement stairs (7) Laundry Room (46) Compost (4) Bathroom (21) Heating (35) Bedroom 1 (3) Living room (5) Patio (2) Patio (55) Little Garage (8) a party with (3) Dressing room (3) Recycle Canopy (9) Dining Room (11) Raisin (169) Electric (30) Sauna (22) Cleaning (6) Entrance thick foam (15) Technical Status (30) Office (2) Water (16) Greyhounds (16) Bathroom thick foam (7) WC (15) WC ( 1st floor) (1)
This week became listed on the task of a thing or two ... new ulkoavaimien (3pcs) thick foam + padlock (Abloy PL341 sarjotettuna) Ordering (Inka) thick foam in the basement bathroom cleaning and washing machine transfer thick foam (sewer are already in place, thick foam cold water requires a bit of magic) Visit the Puukeskus watching the railing thick foam deficiency (round of the .40-50mm, 4m bars 3pcs) Play through a few tile setter and ask to visit its tender (work in progress ...). The sauna floor leveling, as well as the walls, which is yet to be done. Not going to happen tiler let them necessary for leveling, can not be bothered to spoil the floor / walls themselves more space SPU-plates (DONE) Visit buying uretaanipistooli, detergent and foam (lay in the foam is sucks!) thick foam SPU installation, thick foam start on the ceiling and the sauna walls (weekend thick foam during ...) University of home sales (and pay off existing loans) (Thursday) Autumn thick foam leaves and twigs in a landfill export the first batch exported, one next week. Underfloor heating pipes (Lobby to) into the technical space and manifold (if you have time) Call Kait You Know and agree a time when to vintin toilet waters across the IV Parts Ordering (HVAC Point) (weekend during ...) my father, I hope, will bring the first weekend of the missing roof tiles trash shelter father thick foam in law with, hopefully, a little electrical work this coming weekend, which is likely to hold in order to prepare couples to make holes in the walls. Other goodies (floor heating, lime painting ...) 1. Keys and padlock Ordering
Friday: Keys became thick foam ordered and arrive at a lock next week at the Raisio thick foam lock. Also, Kaarina lock responded to the invitation to tender and the link above the back of the posting has been updated. 2. Washing machine transfer to the bathroom
Toilet was cleaned and the drain installed so that the laundry to be washed again only sorrow is that I found the YO-street I bought a washing machine tap anything, thick foam so the machine is now the time being directly connected to the water mains (which has its own small barrier - albeit very impractical for this purpose). So, still have to continue a little tweaking to get more functional barrier washing machine.
The handrails Puukeskus was applied, according to which I grabbed the last of more than 4m 45mm round pine. Monday evening during asenteli railing bracket in place, pätkin pines appropriate dimensions and painted the first layer of paint. On Tuesday, the ropes were continued, and possibly as early as Wednesday, would install them in place.
Painted balustrade, thick foam but it seems that I have a little something to the fine-tuning to do with the paint still installed ... But anyway tomorrow rails in place, both accessible Emppukin climb the stairs a little safer.